See which changes miss your standards. Act with evidence.
Check approvals, linked work and deployment evidence across your repositories. Route findings to the right people and track delivery metrics. Every standard starts as Advisory, and GitHub stops a merge only where you require the Warestack Rules check.
Four weeks on one to three repositories. Success measure agreed before the install.
More pull requests every week, from engineers and agents.
Reviews and CI cover different risks. Written delivery standards can still be difficult to apply consistently as the volume of changes grows.
CONTRIBUTING, the pull request template, the SOC 2 control list. They need a consistent check beside the change.
A required check still needs to evaluate the linked work, the approval count, and whether the only approval came from a bot.
Breakage reaches customers. Who approved what is rebuilt by hand from chat history.
Flag it before it merges. Show the evidence afterwards.
Warestack checks the pull request while reviewers can act, then keeps the observed change record for reporting, audits and incident reviews.
Advisory first, Block merge when you trust it. Standards start as Advisory. Follow-up policies escalate to the people who can act. When a standard set to Block merge is not met, the Warestack Rules check fails, and GitHub stops the merge where you require that check.
Humans and agents alike. A coding agent’s pull request is checked against the same standards as a person’s. When Warestack counts approvals for Require approvals by branch prefix, and in the record taken at merge, approvals from bots and apps do not count. When only a bot has approved, a follow-up policy can ask the area’s owner to review.
Nothing new to adopt. The check on GitHub, the live card in Slack, the timeline on the Linear or Jira issue. Reviewers stay where they are.
Planned: lanes. Your team will name the routine changes that may merge without waiting on a person, each with its exclusions. GitHub will still require your branch’s approvals and do the merge, and Warestack will record why each change qualified.
Pull requests that change files under db/migrations/ must include a Rollback section describing how to revert.
- When any changed file path starts with db/migrations/, the pull request body must contain a heading named Rollback followed by at least one sentence.
- Evidence: the changed file paths and the pull request body. Returns Not evaluated when the evidence it needs, such as the changed-file list, is unavailable.
Four numbers on how your team delivers.
Example delivery metrics, with a trend and the underlying rows for each one.
Not only a dashboard. Ask about delivery in plain English and schedule the report to the channel you choose, weekly, with the CSV.
Evidence underneath. Every number opens into its trend, its data and its breakdown by repository.
Missing approvals show up before the merge. The evidence is on record before anyone asks.
Each finding is on the pull request, with the evidence behind it.
Caught at the pull request. Scope drift, missing approvals and large changes without test files are flagged at the change, with the evidence reviewers need to decide what happens next.
Approver, checks, tests and linked work item on record for observed production changes. Confirm the retention your audit needs before choosing a plan.
Reviews, checks and deployments are recorded together, ready to query and share.
Four weeks on one to three repositories.
Paid, with the success measure agreed before anything is installed. Nothing stops a merge during the pilot unless you set a standard to Block merge and require the Warestack Rules check.
From you. A GitHub organization owner for the install, five minutes. A Slack channel. The standards document you already have.
Choose the success measure before the pilot, such as fewer unreviewed merges or fewer pull requests without a linked ticket. Compare the result with the recorded starting point.