Backed byStandards and follow-up for pull requests from people and agents
Use cases / Security and compliance

The evidence behind your production changes. Ready when your auditor asks.

For the repositories you monitor, see who approved each pull request, which standards it met, its linked work and the deployments GitHub recorded. Ask for the rows in plain English, review the exceptions and export the CSV for your audit.

Four weeks on one to three repositories. Success measure agreed before the install. Nothing stops a merge unless you set a standard to Block merge and require the Warestack Rules check.

Search orbital
HomeDMsActivityFilesMore
orbital
Find a conversation…
Threads
Huddles
Drafts & sent
Saved
Channels
#pull-requests
#deploys
#eng-quality
#releases
Direct messages
PNPriya Nair
JMJo Marchetti you
Agents & apps
Linear
Warestack
deploys11
MessagesAdd canvasFiles & links
WarestackAPP10:30
What shipped to production?
Generated
Thu, Oct 1 at 10:30 AM EEST
Results
31
Highlights
•orbital/control-plane #2049 — feat(webhooks): idempotency keys for delivery · Feature
•orbital/control-plane #2051 — fix(webhooks): retry budget per endpoint · Bug fix
•orbital/console-web #1176 — feat(alerts): label routing for mute windows · Feature
Brief
31 successful production deployments were recorded in this window, 19 in orbital/control-plane and 12 in orbital/console-web, all with environment=prod and state=success.
Open reportOpen brief
Today
WarestackAPP16:30
What shipped to production?
Generated
Fri, Oct 2 at 4:30 PM EEST
Results
38
Highlights
•orbital/control-plane #2061 — feat(api): idempotency keys for webhook delivery · Feature
•orbital/console-web #1190 — fix(alerts): guard empty label sets in muted alerts · Bug fix
•orbital/collector-agent #418 — fix(collector): bound OTLP batch size · Bug fix
•orbital/billing-service #598 — fix(invoices): proration rounding on plan change · Bug fix
•orbital/sdk-go #229 — feat(retry): add jitter to 429 backoff · Feature
Brief
38 pull requests deployed successfully to prod across orbital/control-plane (21), orbital/console-web (9), orbital/collector-agent (4), orbital/billing-service (3) and orbital/sdk-go (1), spanning September 25 to October 2, 2026.
Open reportOpen brief
Generated by Warestack
2 attachmentsDownload all
PDFWhat shipped to production? briefPDF
XWhat shipped to production?CSV
A scheduled report in Slack, with its brief and CSV. Sample data from a workspace.
01CC8.1, as standards

Each control becomes a standard or a report, on the pull request or deployment it covers.

Map your change-management controls to standards that check the observed metadata. Results support your review of each control; they do not certify compliance.

Independent approval
Require independent production approval

The production deployment review was approved by someone other than the person who requested it.

Peer review
Require approvals by branch prefix

The pull request reached merge with the approvals from people its branch prefix requires. Approvals from bots and apps never count toward it.

Traceability
Require a linked ticket · Require production deployment traceability

The pull request links to a Linear, Jira or GitHub work item, and a production deployment traces to an observed pull request.

Testing evidence
Require production verification evidence

A successful production deployment shows observed health, smoke or verification evidence.

Change window
A report you write · merges outside business hours

Ask which pull requests merged outside the hours you name, with the approver, and schedule the answer weekly for review.

Sensitive paths
Require owner approval for sensitive changes

Changes under paths you name need an approval from an observed code owner other than the author.

02When agents and bots approve

SOC 2 does not say who must approve a change.

Its change-management criterion asks that changes be authorized, tested and approved. Whether an approval from a bot or an agent is enough is your auditor’s call. Warestack shows what happened on each change, so you can answer either way.

Who approved it, and was it a person?
Available

When Warestack counts approvals for Require approvals by branch prefix, and in the record taken at merge, it leaves out bots and apps, such as review bots, Actions workflows and Copilot, and the author’s own. Unreviewed merges counts the merges with no approval from a person other than the author.

Was the production approval independent?
Available

Require independent production approval checks that a production deployment was approved by someone other than the person who requested it. GitHub’s environment reviewers still decide whether it goes ahead, and a saved report lists each decision: who, what, when and the message.

What if only a bot approved?
Available

A follow-up policy can ask the area’s owner for a review when only a bot has approved a pull request.

Why did a change merge without a person?
Planned

Lanes will let your team decide which kinds of change may merge without a person’s review. For each one, Warestack will record which lane covered it and why, so the decision is on record instead of a gap.

03The record

Kept per change. Exported when asked.

For each observed production change: the pull request, the approver and whether they were independent, the checks that ran, the linked work item, the deployment and its review. Queryable in plain English, scheduled to Slack or email, exported as CSV.

Plan retention around your audit. Confirm the required observation period and retention with our team before choosing a plan.

Runs kept. A scheduled report keeps each run with its rows, unless someone deletes the run or the report, so last quarter’s answer is still there this quarter.

Briefs for the reader. A written summary of one result for the audience that asked, with every claim linked to its evidence row.

Change record · control-plane #2061Standards met
Pull request
control-plane #2061 · feat(api): idempotency keys for webhook delivery
Linked work item
ORB-402 · In Progress at merge · assigned to rdiaz
Approvals
lhartmann, meichen · 2 human approvals · independent of author
Checks
14 passed · 0 failed · Warestack Rules: 12 passed
Merged
Sep 30, 11:40 · main · by rdiaz
Deployment review
prod · approved by lhartmann · independent of requester
Deployed
Sep 30, 16:30 · release 2026.09.30-1 · verification evidence observed

Sample data. One row of 186 this month. Export a week at a time as CSV, or schedule the report weekly to the compliance channel.

04Outcomes

Evidence and exceptions, ready for review.

Findings reach the people who can act, with the evidence behind them.

SOC 2 audits

Approver, checks, tests and linked work item on record for observed production changes since you connected the repository. Review the exceptions with their evidence and export the rows a week or a month at a time, up to 100 rows a report.

Customers

Caught at the pull request. Missing approvals, large changes without test files and scope drift are flagged with their evidence, so reviewers can address the exception before it becomes an incident.

Change history

Query the observed record of a change and share the relevant rows with your reviewers.

Not a code reviewerReview bots judge the code. Warestack checks whether a change met the standards its team set, and some standards read the diff to do that. It does not look for bugs, run your CI or orchestrate coding agents. People and agents are checked against the same standards at the same point, the pull request.
05For your security review

What Warestack reads and writes.

The GitHub app uses change metadata and may fetch pull request diffs, workflow definitions and the logs of failed runs. Review provider permissions and data-processing requirements before installation.

Reads

Pull requests with their commits, diffs, comments and review threads, reviews, approvals, checks, issues, workflow runs, deployments, branch protection, CODEOWNERS and the instruction files a standard names, organization members and teams; work item key, title, description, status and assignee from Linear or Jira, and priority and labels from Linear; in Slack, the /warestack command, the Warestack shortcut and the thread it is run on.

Writes

The Warestack checks, comments and, when a person asks, the description on pull requests; Slack messages; the Warestack panel and comments on the work item. A follow-up policy can also request reviewers, add labels, open a Linear or Jira issue or move a Linear issue. Only what your standards and follow-up policies call for, or a person in your space asks for.

Enterprise

Review retention, identity, access and infrastructure requirements with our team. Confirm the agreed scope and terms before purchase.

01
Install on the pilot repositories
One to three. An organization owner reviews the GitHub App permissions and chooses the repositories it can access.
Week 1
02
Map your controls to standards
Start with the six above. The standards stay Advisory during the pilot.
Week 1
03
Run the record for a month
Schedule the production-change report weekly to your compliance channel. Compare it with what you assemble by hand today.
Weeks 2 to 4
04
Decide what becomes required
Which standards to set to Block merge, on which repositories. The record continues either way.
Week 4

Agree on a success measure before installing, then compare the observed change coverage and reporting effort with your starting point.

© 2026 Warestack Inc.